Brent,
“On the Central Server Room project, Access Construction Products delivered for the Elk Falls Mill and Fransen Engineering. Initially, Brent at Access conducted a seminar for the office and then quickly finalized design & ordered the flooring system to meet the early January plant wide shutdown schedule. The install crew worked around the cabling installation and completed the work on a weekend. Overall, the customer’s project met the schedule and they are pleased with the installation. From an engineering perspective, we went from design change to install in less than 6 weeks over the Christmas season with a can do attitude.”
Thank you,
George Coelho, P.Eng.
Senior Project Engineer
gcoelho@fransen-eng.com
“Their work was fast, efficient and accurate – a first class job. This is the best installation I have ever been involved with.”
Ted Yeadon
Catalyst Paper
Ted.Yeadon@catalystpaper.com
"Thanks for your
efforts throughout the process from specifications
to construction and again at the warranty stage.
Your follow up is worthy for any future project.
The Haworth AR sealed exposed concrete surface
is holding up fantastically. Good job!"
Christina Fong
MCMI
"I
also want to thank you and your team very much
for your great work and impeccable work ethic!
It has been an absolute pleasure working with
you."
Robin Gill
Teekay Shipping
|